Details Revealed of Plans for the Brentford Lock Holiday Inn |
|
Expanded hotel would become part of the Marriott chain
October 9, 2026 Splendid Hospitality Group has revealed its plans to transform the Brentford Lock Holiday Inn into a Marriott hotel, with refurbished facilities, new landscaping and a larger building than the one standing today. The company, which owns the hotel, says it wants to reinvest in the existing building rather than replace it, giving the hotel a longer-term future in Brentford. The plans would retain and refurbish the structure, reconfigure the lower floors and expand the conference and meeting spaces, gym and lounge areas. Information released so far is vague on the level of expansion planned but a computer generated image released as part of the public consultation shows a building of a similar size and height to the current building which rises to six storeys. The hotel sits at the junction of Commerce Road and London Road, between the Grand Union Canal and the River Brent. The ground floor would be reorganised to create a more welcoming layout, with improved lounge and hospitality areas, conference and event space, a new staircase and lift, and a new fire escape stair. A floor plan shows a conference space with a seating plan for 624 people. On the first floor, new meeting rooms and a gym of around 145 square metres would sit alongside bedrooms. The second and third floors would be reorganised around a central corridor with rooms on both sides. Many rooms are shown at 22 to 25 square metres, with some suites at 26 to 30 square metres. Outside, the landscape design responds to the Grand Union Canal & Boston Manor Conservation Area. It includes bespoke timber planters, climbing plants, new seating built into existing stepped areas, a wildflower mix replacing lawn, and biodiverse green roofs.
The consultation boards give no figures for height, floor area or bedroom numbers, but the drawings offer some clues. The most visible change is a "modest extension" that enlarges the first-floor plate into an existing internal lightwell. The plans say this allows meeting and gym space to be added while keeping the hotel's overall number of bedrooms. The ground floor changes are described as taking place entirely within the existing building. The company says the plans retain "the overall approach to the scale and form of the building", but the images suggest the hotel may be bulkier than it appears from some viewpoints, such as the view from Tallow Road. The boards also say the proposals would "provide additional guest accommodation", while the floor plans refer to maintaining the existing room count.
The company says the design has been refined in response to feedback on overlooking, materials, landscaping and neighbouring spaces, and has been considered at two Design Review Panel sessions. A public exhibition was held on Thursday 8 October. A planning application is due in late 2026, with a decision expected in early 2027. If approved, construction would begin in late 2027, with completion in 2029. Feedback can be sent to info@brentfordhotelconsultation.co.uk, by phone on 0203 026 3229, by post to FREEPOST CRATUS COMMUNICATIONS (no stamp needed), or via brentfordhotelconsultation.co.uk.
|