Forthcoming Roadworks in Brentford

Traffic delays likely in the local area

Participate

Traffic and Travel in Brentford

Sign up for our free newsletter

Comment on this story on the

A315 High Street, Brentford, London Borough Of Hounslow
14 September — 15 September Road closure
Delays likely due to Streetworks
Pfi- Carriageway Resurfacing at A315
Responsibility: Hounslow London Borough Council
EToN status: Planned work about to start
A4 Great West Road, Brentford, London Borough Of Hounslow
14 September — 15 September Lane closure
Delays likely due to Streetworks
25/013 Tel40427 - Access Poles 4 And 6 To Replace Box Sign Lamps. 22:00-05:00 (One Night) Pole 4 - Lane 3 E/B And Lane 5 W/B. Then Swapping To Pole 6 - Lane 1 W/B at A4
Responsibility: Transport For London
EToN status: Planned work about to start
B4491/A4000 Gunnersbury Lane, Acton, Ealing
14 September — 16 September Traffic control (two-way signals)
Delays likely due to Streetworks
S81 Planned Cover Replacement--Works Intended To Include First Time Permanent Reinstatement Within Same Phase at B4491/A4000
Responsibility: Thames Water
EToN status: Planned work about to start
B452 Windmill Road, Brentford, London Borough Of Hounslow
15 September — 18 September Traffic control (two-way signals)
Delays likely due to Streetworks
Disconnection In Carriageway. Our Intention Is To Complete The Permanentreinstatement In The Same Phase at B452
Responsibility: Thames Water
EToN status: Planned work about to start
M4
14 September — 15 September Road closure
Delays likely due to Streetworks
2200-0530hrs, Carriageway Closure, Eastbound For Structure Works. Diversion Route: M4 East Bound Onto Hogarth Lane Onto Hogarth Roundabout Onto A4 Westbound Or A316 at M4, Jct 2 Eastbound Exit Slip.
Responsibility: Highways England
EToN status: Planned work about to start

 

September 14, 2015

Bookmark and Share